Legislation / Missouri / SB 618

Missouri SB 618 · 2025 Regular Session

Creates provisions relating to electrical corporations

SB 618 - The act creates provisions relating to electrical corporations. AMOUNTS INCLUDED IN CONSTRUCTION WORK IN PROGRESS (Section 393.135) The act provides that, subject to certain limitations, an electrical corporation may include construction work in progress for any new natural gas-generating unit in rate base amounts recorded. The inclusion of construction work in progress shall be in lieu of any applicable allowance for funds used during construction that would have accrued after the effective date of new base rates reflecting inclusion of the construction work in progress in rate base. The Public Service Commission shall determine the amount of construction work in progress that may be included in rate base. The amount shall be limited by the estimated cost of the project and project expenditures made within the estimated construction period for such project. Base rate recoveries arising from inclusion of construction work in progress in base rates are subject to refund, as described in the act. These provisions shall expire on December 31, 2035, unless the Commission determines, after a hearing as described in the act, that good cause exists to extend these provisions through December 31, 2045. The secretary of the Commission shall notify the Revisor of Statutes when the conditions for the extension have been met. This provision is identical to a provision in HB 92 (2025), a provision in HB 853 (2025), a provision in HB 963 (2025), a provision in SCS/SB 186 (2025), and similar to a provision in HB 1084 (2025), a provision in SS#2/SB 4 (2025), a provision in SB 48 (2025), a provision in SB 214 (2025), and a provision in SB 610 (2025). ELECTRICAL CORPORATION'S PLAN TO OWN SUFFICIENT CAPACITY (Section 393.1080) The Public Service Commission may require an electrical corporation to provide documentation annually reflecting the corporation's plan to own or have rights to sufficient capacity to meet its capacity obligations for the upcoming pla

What the bill says

From the introduced text

FIRST REGULAR SESSION SENATE BILL NO. 103RD GENERA L ASSEMBLY INTRODUCED BY SENATOR CIERPIOT. 2345S.01I KRISTINA MARTIN, Secretary To repeal section 393.135, RSMo, and to enact in lieu thereof three new sections relating to electrical corporations. Section A. Section 393.135, RSMo, is repealed and three new sections enacted in lieu thereof, to be known as sections 393.135, 393.1080, and 393.1900, to read as follows: 393.135. 1. Except as provided in subsection 2 of this section, any charge made or demanded by an electrical corporation for service, or in connection therewith, which is based on the costs of construction in progress upon any existing or new facility of the electrical corporation, or any other cost associated with owning, operating, maintaining, or financing any property before it is fully operational and used for service, is unjust and unreasonable, and is prohibited. 2. (1) An electrical corporation shall be permitted, subject to the limitations in this subsection, to include construction work in progress for any new natural gasgenerating unit in rate base amounts recorded. The inclusion of construction work in progress allowed under this subsection shall be in lieu of any otherwise applicable allowance for funds used during construction that would have accrued from and after the effective date of new base rates that reflect inclusion of the construction work in progress SB …

Read the full official text

Sponsor

Latest actions

  1. Reported Do Pass (H) - AYES: 6 NOES: 2 PRESENT: 0

  2. Voted Do Pass (H)

  3. Executive Session Completed (H)

  4. Referred: Rules - Legislative(H)

  5. Reported Do Pass (H) - AYES: 12 NOES: 4 PRESENT: 0

  6. Voted Do Pass (H)

  7. Executive Session Completed (H)

  8. Second Read and Referred S Commerce, Consumer Protection, Energy & the Environment Committee

  9. Public Hearing Completed (H)

  10. Referred: Government Efficiency(H)

Common questions

What is SB618?
SB618 is a bill in the Missouri Legislature (2025 Regular Session): Creates provisions relating to electrical corporations.
What does SB618 do?
SB 618 - The act creates provisions relating to electrical corporations. AMOUNTS INCLUDED IN CONSTRUCTION WORK IN PROGRESS (Section 393.135) The act provides that, subject to certain limitations, an electrical corporation may include construction work in progress for any new natural gas-generating unit in rate base amounts recorded. The inclusion of construction work in progress shall be in lieu of any applicable allowance for funds used during construction that would have accrued after the effective date of new base rates reflecting inclusion of the construction work in progress in rate base. The Public Service Commission shall determine the amount of construction work in progress that may be included in rate base. The amount shall be limited by the estimated cost of the project and project expenditures made within the estimated construction period for such project. Base rate recoveries arising from inclusion of construction work in progress in base rates are subject to refund, as described in the act. These provisions shall expire on December 31, 2035, unless the Commission determines, after a hearing as described in the act, that good cause exists to extend these provisions through December 31, 2045. The secretary of the Commission shall notify the Revisor of Statutes when the conditions for the extension have been met. This provision is identical to a provision in HB 92 (2025), a provision in HB 853 (2025), a provision in HB 963 (2025), a provision in SCS/SB 186 (2025), and similar to a provision in HB 1084 (2025), a provision in SS#2/SB 4 (2025), a provision in SB 48 (2025), a provision in SB 214 (2025), and a provision in SB 610 (2025). ELECTRICAL CORPORATION'S PLAN TO OWN SUFFICIENT CAPACITY (Section 393.1080) The Public Service Commission may require an electrical corporation to provide documentation annually reflecting the corporation's plan to own or have rights to sufficient capacity to meet its capacity obligations for the upcoming pla
What is the status of SB618?
Introduced as of January 23, 2025. Latest action: Reported Do Pass (H) - AYES: 6 NOES: 2 PRESENT: 0 (April 24, 2025).
Who sponsored SB618?
Mike Cierpiot (R, 08).
Where is the official record for SB618?
On the Missouri Legislature website: https://www.senate.mo.gov/BillTracking/Bills/BillInformation?year=2025&billid=2899286

Source: official Missouri record. Tracked by Delilah, AI for legislation across all 50 states and Congress.